Lightning Protection Design – TM2500 Mobile Gas Turbine
Lightning Protection Design TM2500 Mobile Gas Turbine
Project Completed - Q1 2025
Delivered a complete lightning protection design and risk assessment for a TM2500 trailer-mounted gas turbine at Channel Island Power Station. The design was developed inline with AS1768 and tailored to the unique requirements of modular and mobile power generation equipment.
Key Deliverables:
- AS1768-compliant lightning risk assessment
- Protection design for turbine, transformers, auxiliary units, and 11kV switchrooms
- Custom layout of air terminals, down conductors, and earthing systems
The solution ensures full compliance and enhanced safety for critical generation assets, addressing both permanent infrastructure and temporary deployment needs.